Inspection & Expediting Services

Service

This is a brief list of suppliers whose products we have inspected. This list will be updated from time to time

References

Responsible for inspection and certification of all types of equipment at the following fabrication and manufacturers’ locations:

Aich & Co.GmbH – 88069 Tettnang – Germany

Allweiler AG – 78301 Radolfzell – Germany

ALMIG-Kompessoren GmbH – 73257 Koengen – Germany

Anlagenbau Neundörfer GmbH – 91094 Langensendelbach

AREVA Energietechnik GmbH – 93055 Regensburg – Germany

Bauer Kompressoren GmbH – 81477 München – Germany

Bosch-Rexroth  Brueninghaus Hydromatik GmbH – 72160 Horb – Germany

Brück Rohrverbindungen GmbH – 40724 Hilden – Germany

Bucher Hydraulics GmbH – 79771 Klettgau – Germany

Buchele Elektromotorenwerk GmbH – 90262 Nürnberg – Germany

Buderus Edelstahl GmbH – 35576 Wetzlar – Germany

Burkhardt GmbH – 95444 Bayreuth – Germany

BWB Behälterbau GmbH + Co.KG – 89331 Burgau Germany

CASAR Drahtseilwerk Saar GmbH – 66459 Kirkel – Germany

CF Meier Leichtgusswerk GmbH u. Co.KG – 89548 Königsbronn – Germany

AG der Dillingen Huettenwerke – 66763 Dillingen – Germany

Edelstahl Rosswag – 76327 Pfinztal – Germany

Flender Guss GmbH – 09228 Chemnitz – Germany

Hamworthy Serck Como GmbH – 21502 Geesthacht – Germany

Hansaflex GmbH – 22525 Hamburg – Germany

Heine + Beisswenger Stiftung + Co.KG – 64807 Dieburg – Germany

Internormen Technology – 68804 Altlussheim – Germany

IRS Engineering GmbH – 82299 Türkenfeld – Germany

Karl Diederichs KG – 42899 Remscheid – Germany

Käser Kompressoren GmbH – 96410 Coburg – Germany

Kendrion Binder Magnete GmbH – 78002 Villingen Schwenningen – Germany

KS Kolbenschmidt GmbH – 74172 Neckarsulm – Germany

Kracht GmbH – 58791 Werdohl – Germany

Leistritz Pumpen GmbH – 90459 Nuernberg – Germany

L’Orange GmbH – 72293 Glatten – Germany

Lowara Deutschland GmbH – 73762 Grossostheim – German

Mahle GmbH – 71706 Markgröningen – Germany

MAN Diesel SE – 86224 Augsburg – Germany

Max Weishaupt GmbH – 88475 Schwendi – Germany

Nold Hydraulik + Pneumatik GmbH – 88339 Bad Waldsee – Germany

Noris Marine Systems GmbH & Co.KG – 90429 Nürnberg – Germany

Ortlinghaus-Werke GmbH – 42907 Wermelskirchen – Germany

Reiner Brach GmbH & Co.KG – 28237  Bremen – German

Renk AG – 86159 Augsburg – Germany

Gebr. Rieger GmbH + Co.KG – 73431 Aalen – Germany

Roland Deeg GmbH – 74592 Kirchberg – Germany

Schuler Guss GmbH & Co. KG – 73033 Göppingen – Germany

SIEMENS AG, I DT LD I – 90441 Nürnberg – Germany

STABA GmbH – 06749 Bitterfeld – Germany

Starkstrom-Gerätebau GmbH – 93055 Regensburg – Germany

STENFLEX Rudolf Stender GmbH – 22851 Norderstedt – Germany

ThyssenKrupp Gerlach GmbH – Remscheid – Germany

VEM Sachsenwerk GmbH – 01257 Dresden – Germany

Voith Turbo GmbH – 74555 Crailsheim – Germany

WDI GmbH, Drahtseilwerke Zwickau – 08056 Zwickau Germany

Wolf + Hekel GmbH & Co. KG – 74370 Sersheim – Germany

Witzenmann GmbH – 75175 Pforzheim – Germany

Zirro Stahl- und Maschinenbau GmbH – 86529 Schrobenhausen – Germany

Zollern GmbH & Co.KG. – 72517 Sigmaringen – Germany

ZZ-Antriebe GmbH – 76139 Karlsruhe – Germany

 

Clients HISTORY as follows: Update

 

 

 

Familiar with:

Verification of Non Destructive Examinations,

Positive Material Identification (PMI) acc. to EN 10204-3. Ferrite Content

Testing acc. to ISO 17655 Impact Strength Testing acc. to Charpy EN 10045 Hardness Testing acc. to EN 10003/ISO 6507-1

Dye Penetrant Testing acc. to DIN 54152 Radiographic Testing (RT)

acc. to EN 12517Magnetic Particle Testing (MT) acc. to EN 473Ultrasonic Testing (UT) acc. to EN 1712 NPSH /

Noise and Vibration Testing (API 610)Painting Control (Grid-Cutting) acc. to DIN EN ISO 2409

 

Main Clients (brief extract not complete):

 

ABS Industrial Services UK

GE / NP Italy

Samsung Korea

Williams USA

Dominion USA

Dresser Rand

UPI

Florida Gas

HHI

Kyocera

Siemens

RINA                           Naval and Industrial Services

GL

LR

TÜV

KSI

ACES-GQS

Intertek

NDE

 

and many others and almost all existing major agencies.

 

As well as some Oil & Gas companies directly as a consultant and QC representative in Europe for a wide variety of projects.

 

List of freelance assignments, Peter Fuchs

Supplier Place Subject Project Description
Bergrohr Siegen straight welded pipes Neftokin Burgas Final Inspection
Hydac Sulzbach oil filters Sabah Ammonia UREA Pressure Test & Final Inspection
Hydac Sulzbach accumulators & oil filters Braskem & Samur Expediting
Hydac Sulzbach accumulators & oil filters Braskem & Samur Pressure Test; Expediting
Voith Crailsheim planetary gear Presalt P68  main compressors FAT
Renk Augsburg high speed gear Talisman Energy FAT incl. Parts Inspection
Siemens Ruhstorf HV motors Naftal Algeria Final Inspection
Parker Hannifin Lampertheim hoses ABDEX Australia Pressure Test
Siemens Ruhstorf HV motors Naftal Algeria Final Inspection
Kablitz Lauda-Königshofen Heat Exchanger TUPRAS Izmit upgrading Loss Assessment
Renk Augsburg high speed gear Talisman Energy FAT incl. Parts Inspection
Siemens Nürnberg turbine spare parts Stanlow 2013 TA event Expediting
Voith Sonthofen high speed gear Maritime DF2 FAT
Siemens Bad Neustadt/Saale LV motors Assil&Karam Gas Dev.Pjt. FAT
Siemens Ruhstorf HV motors Keppel Subic Shipyard B348 FAT
Netzsch Waldkraiburg spiral pumps Panyu 34-1 FAT
SGL-Carbon Meitingen Heat Exchanger Sadara Chemical Company Pressure Test, Paint Check
Frenzelit Himmelkron Compensators PACO Power Plant; Panama Final Inspection
Metso Horgau ESD Valves (Butterfly) Petron Refinery Philippines Performance Test
Siemens Baiersdorf automatisation equipment Atoom Energy Company; Jordan Final Inspection
Tegum Hallein/A Hydrocyclones Rovinari, Romania Trial Assembly
Schneider Regensburg HV panels OWP Butendiek FAT
Wero Thyrnau cylinder resonators Teekay Petrojarl Jordbaer FPSO Pressure Test
Schlick Untersiemau liquid lances Sadara Chemical Company Final Inspection
KSB Pegnitz centrifugal pumps Helwin 2 platform FAT
Emerson Wessling Transmitter Cochabamba, REPSOL YPF E&P BOLIVIA Final Inspection
Gardner Nürnberg Liquid Ring Seal Compressor Horizon Oil Sands Pre Inspection Meeting

(back-up)

IMB Roth LV distribuiton boards OWP Butendiek FAT
Voith Crailsheim planetary gear Cluster Well Platform, India FAT incl. Parts Inspection
Voith Crailsheim cardan shafts Woodside Australia Expediting
Siemens Nürnberg converter panels Slurry Pipeline Project Morocco FAT
KEM Küppers Bad Kötzting Turbine Flowmeters Tamar Refurb Kizomba Calibration Verification
Siemens Ruhstorf HV motors retrofit Heidrun LPP FAT
Leistritz Nürnberg screw pumps Colfax Replacement, Venezuela Final Inspection
Emerson Wessling Transmitter Mochovce NPP, Slovakia Final Inspection
Emerson Wessling Orifice Plates Korea; BP Quad 204 Final Inspection
Siemens Nürnberg converter panels Cobalt Explorer FAT
Siemens Ruhstorf HV motors Prelude Expediting & Paint Inspection
Fima Obersontheim Blowers Sadara Chemical Company, Saudi-Arabia Inspections & FAT
MAN Deggendorf Oxidation Reactors Gazprom Neftekhim Salavat In-Process Inspections
Intertec Neustadt/Donau Enclosure & Transmitter BG Armada Platform Final Inspection
Emerson Wessling Transmitter Bacton MRU Rejuvenation Final Inspection
Netzsch Waldkraiburg spiral pumps Judy Closed  Drains Pumps Upgrade Expediting; FAT
Renk Augsburg gearbox Troll A Paint Inspection
Emerson Wessling Transmitter Bacton MRU Rejuvenation Final Inspection
Siemens Ruhstorf HV motors Berrahal et Skikda-Khroub, Algeria FAT
Intertec Neustadt/Donau Enclosure & Transmitter Bacton MRU Rejuvenation Final Inspection
UPDATE        
KSB Pegnitz centrifugal pumps Arbre à SOUSSE étape D; Algeria FAT
Emerson Wessling Transmitter Al Khafji UHOCF Upgrading Final Inspection
KSB Pegnitz centrifugal pumps RAS DJinet Combined Cycle PP Pressure Test
Siemens Günzburg ClO2 generators MOE&W Kuwait FAT
Siemens Obermichelbach Communication Cubicles Gaz Hassi Messaoud; Algeria FAT
Gerberich Mannheim Discharge Gear Pump Saudi Elastomers FAT
Emerson Wessling Transmitter BP Clair Ridge Project Final Inspection
KSB Pegnitz centrifugal pumps North Bangkok CCPP Block 2 FAT
Intertec Neustadt/Donau Enclosure & Transmitter Goliat FPSO Final Inspection
TREMA Creußen Reactor Cyclones Qatar Solar Tec. Polysilicon Final Inspection
Emerson Wessling Transmitter Perla Field Early Prod. Develop. Final Inspection
Andritz Vierkirchen 2 Pusher Centrifuges Ampliacion Planta Protasa FAT
KSB Pegnitz centrifugal pumps SAFCO V – Urea stand alone Jubail Final Inspection
Siemens Frankfurt/Main converter panels Hebron, Exxon Mobil FAT
Geis Erlangen switch panels Gaz Hassi Messaoud; Algeria Packing Inspection
Siemens Ruhstorf HV motors retrofit Heidrun LPP FAT
Siemens Nürnberg control panels Odfjell Rig III Project; DSME Hull 3033 FAT
Siemens Nürnberg HV motors Indorama Eleme Fertilizer FAT
Emerson Wessling Transmitter BP Clair Ridge Project Final Inspection
KSB Pegnitz centrifugal pumps EPIC Dragon Oil FAT
Siemens Fürth automation equipment RAS DJinet Combined Cycle PP FAT
Siemens Nürnberg HV motors Indorama Eleme Fertilizer FAT
Zaigler Kulmbach compressor housings Jamnagar Gasification Complex Pressure Test
BASF (Inge GmbH) Greifenberg Ultrafiltration Modules RIL-J3-DTA Gasification Complex – Jamnagar, Gujarat India Final Inspection
Eagleburgmann Eurasburg Dry Gas Seals TAQA Bratani Pressure Test
Emerson Wessling Transmitter TIDIKELT/SBAA Final Inspection
Eagleburgmann Eurasburg API Plan 53B PDO Amin Production Station Pressure Test
Stern Geiersthal Dismantling Pieces WWTP Kerbala Final Inspection
KSB Pegnitz Centrifugal pumps Aqaterm FZCO FAT, Final Inspection
Gardner Nürnberg Vacuum ring pumps Saudi Elastomers FAT
Stahl Künzelsau Gantry Cranes Britannia Platform Expediting
Stahl Künzelsau Wire Rope Hoists Monorail 1 / Monorail 11 FAT
Numberger St.Wolfgang Distribution pipes Al Mallah WWTP Final Inspection
Schneider Regensburg 33kV GIS modification panels BAB Gas Compression Phase III Stage Inspection
KSB Pegnitz Centrifugal Pumps TVK BDE FAT
Tyco Ottobrunn Cable Accessories Takreer CB&DC Project Final Inspection
Gebhardt Cham,Domazlice/CZ Cash Container Central Bank of Kuwait Final Inspection
Rädlinger Weiding In-Field Lining Petronas Carigali FAT
Netzsch Waldkraiburg Spiral pumps Summail Gas FAT
Linde Tacherting Heat Exchanger Sabine Pass pressure test
Industronic Wertheim PAGA System UGCC Final Inspection
Streicher Niederwinkling CPI Separators, Sump Tanks South Rumailah Oil Field Final Inspection
KSB Pegnitz Centrifugal pumps EEPE FAT & Final Inspection
KSB Pegnitz Centrifugal pumps IEFCL FAT & Final Inspection
Siemens Nürnberg HV motors Tüpras Izmir Refinery Resid Upgrading Final Inspection
KSB Cadolzburg/Nürnberg Pumps MCPK Packing Inspection

UPDATE

 

Supplier Place Subject Project Description
BASF (Inge GmbH) Greifenberg Ultrafiltration Modules Extension of RIL-J3-DTA Gasification Complex – Jamnagar, Gujarat India Final Inspection
AKW A+V Hirschau Hydrocyclones O MON THERMAL POWER PLANT Final Inspection
Eagleburgmann Eurasburg Seal Systems Sadara Final Inspection
Intertec Neustadt/Donau Enclosure & Transmitter Goliat FPSO Final Inspection
Kirsch Burghausen Solvent Regeneration Vessel TVK BDE pressure test, final inspection
Siemens München Telecom Systems Iraq Electricity Sector Reconstruction FAT
Coperion Waeschle Baienfurt Rotary Feeder EEPE FAT, Final Inspection
Zeppelin Friedrichshafen Rotary Feeder EEPE FAT, Final Inspection
Wero Thyrnau Valve Skid Container PSV – DBN GAS FASE 2 pressure test, final inspection
Renk Augsburg Gearbox Adma Sarb Tooth contact check
Schneider Regensburg 33kV GIS modification panels Investment Aden MOE FAT, Final Inspection
Gardner Nürnberg Watering Pump Cerro Dragon (ARG) FAT
KSB Pegnitz centrifugal pumps Enka Najiba Document Review
KSB Pegnitz centrifugal pumps Glycol Reliability Improvement Yanbu Saudi Arabia Final Inspection
IssyTec Worms Lube Oil Units Pupuk Sriwidjaja Palembang II FAT & Final Inspection
Huber Berching Sludge Dewatering Unit EDAR El Espinar FAT & Final Inspection
Siemens Nürnberg converter panels GTC444, Upgrading of Mesaeed Town FAT
Siemens Ruhstorf HV Motors Ethydco FAT
Siemens Ruhstorf HV Motors Aasta Hansteen Topside EPC FAT
BASF (Inge GmbH) Greifenberg Ultrafiltration Modules RIL Jamnagar C2 ETP Final Inspection
Intertec Neustadt/Donau Enclosure & Transmitter Everest Metering Final Inspection
Lapp Wunsiedel Outdoor post insulators Sendayan FAT
Siemens Nürnberg Power Transformer Sonelgaz Mobile Substations 2 FAT
Siemens /Highvolt Erlangen

/Dresden

Electrostatic Precipitator Usiminas Ipatinga Expediting
Gardner Nürnberg Liquid ring vacuum pump Alasehir Geothermal Power Plant FAT
Frenzelit Himmelkron Compensators Shinboryeong PP #2 Material Property Tests
OMV Burghausen Field Office Container CIA Canada Final Inspection
Leistritz Nürnberg Screw pump Aasta Hansteen Topside EPC FAT
Netzsch Waldkraiburg Spiral pumps Aasta Hansteen Topside EPC FAT
Emerson Wessling Transmitter BG Armada Platform Final Inspection
Emerson Wessling Transmitter BP Clair Ridge Project Final Inspection
ABB Brilon Power Transformers Aasta Hansteen Topside EPC FAT
Siemens Nürnberg Steam Turbine Hendrina 1 HD Clearance Check
Intertec Neustadt/Donau Enclosure & Transmitter BG Armada Platform Final Inspection
Spangler Dietfurt control panels Atotonilco de Tula FAT & Final Inspection
Lapp Wunsiedel Outdoor post insulators PMU SG. ARA GIS FAT
Emerson Wessling Transmitter BP Clair Ridge Project Final Inspection
Siemens Ruhstorf Motors Future Growth Project, Tengizchevroil FAT
Siemens Kirchheim/Teck Power Transformer Kusile Power Station FAT
KSB Pegnitz Pumps Le Havre et Cordemais Carbon FAT
Voith Crailsheim Gearbox DH-2 Hyosung FAT
Draka Comteq Nürnberg Profibus Cables SHELL MARINA LOBP GMP FAT

UPDATE

Supplier Place Subject Project Description
Emerson Wessling Transmitter BP Clair Ridge Project Final Inspection
Hima Brühl System & Marshalling Cabinets Comperj Petrobras Hardware FAT
Tyco Ottobrunn Termination and Splicing Kit CBDC Project Final Inspection
Inge Greifenberg Ultrafiltration Modules Mangalore PTA Plant Final Inspection
Maschinenfabrik Reinhausen Regensburg On Load Tap Changer Sohar Refinery Improvement FAT
Draka Comteq Nürnberg Profibus Cables Third Party Flame Test Validation Flame Test Validation
KSB Pegnitz Pumps TGT Field Development Expediting
Renk Augsburg gearbox MOGAS Cogen Gear Accuracy Check, balancing, tooth contact check, FAT, final inspection
Invent Erlangen Mixers Al-Shatra Sewerage Final Inspection
Siemens Nürnberg Motors MARTIN LINGE TOPSIDES EPSCC FAT
Renk Augsburg high speed gear Kaombo FAT & Final Inspection
Sipos Altdorf Booster Fan Actuator O MON THERMAL POWER PLANT FAT & Final Inspection
Wero Thyrnau Turbine an Pump ducts Jamnagar Gasification Complex Pressure Test
Voith Crailsheim Gearbox DH-2 Hyosung Final Inspection
Rheonik Odelzhausen Mass Flowmeters Ivar Aasen Field Development Pressure Test
Sandvik Fellbach Pastillator Aurora EOS Pre-Inspection-Meeting (PIM)
Wero Thyrnau PSA Valve Skid Mostorod Final Inspection
Siemens Ruhstorf Motors Tengizchevroil FGP/WPMP Ultrasonic Test
Siemens Penig gearbox Aurora EOS FAT
Knürr Arnstorf Technical Furniture Al Diwanya Final Inspection
STEP Neufinsing Cabinets PSV – DBN GAS FASE 2 FAT
Leistritz Nürnberg screw pumps Modernizacion de la Refineria de Talara PIM/Expediting/FAT
Voith Sonthofen gearbox Shaybah FAT
Siemens Ruhstorf Motors Tengizchevroil FGP/WPMP Coil Surge Test, Shaft Ultrasonic Test
SGB Regensburg Power Transformer Santo Domingo en Oaxaca, Mexico Stage Inspection & FAT
Wero Thyrnau PSA Valve Skid RPLC Deep Conversion Puerto La Cruz PSA Skid FAT
Huber Berching Vertical Screens EDARs Campina Baja (Guadalajara) Final Inspection
Siemens Nürnberg Motors Tengizchevroil FGP/WPMP FAT
Eaton’s Crouse Hinds Eberbach Lightning Fixtures Umm Lulu Full Field Development Final Inspection
Wero Thyrnau Tank, Base Plates, Pipings Petronas Floating LNG2 Stage Inspection
Siemens Nürnberg Frequency Converters Tengizchevroil FGP/WPMP Insulation Test / High Voltage Test
Siemens Ruhstorf Motors Umm Lulu Full Field Development FAT
Siemens Nürnberg Steam Turbine Western Mining Kick-off meeting
Siemens Ruhstorf Motors KNPC SHFP FAT
Inmatec Herrsching Nitrogen Generator FRD Lebada East FAT
Emerson Wessling Transmitter BP Clair Ridge Project Final Inspection
Anlagenbau Neundörfer Langensendelbach Cooling Units for Frequecy Converters Future Growth Project, Tengizchevroil FAT

UPDATE

Supplier Place Subject Project Description
R.Stahl Schaltgeräte Waldenburg Power Junction Boxes (Change Over Switches) Umm Lulu Full Field Development Final Inspection
Hosokawa Augsburg & Leingarten Granulator & Compactor INB SINA Polyoxymethylene FAT
Siemens Nürnberg Turbine Rotor ADNOC Abu Dhabi Final Inspection
R.Stahl Schaltgeräte Waldenburg Power Junction Boxes (Change Over Switches) Umm Lulu Full Field Development Final Inspection
Siemens Ruhstorf Variable Speed Drive System (VSDS) Sonatrach CAFC Algeria FAT
KSB Pegnitz centrifugal pumps Hamrya Free Zone, Phase 2 FAT
Siemens Nürnberg Motors Al Ruwaite / KSA; Ashaba Phase III FAT
Voith Sonthofen Gearbox Umm Lulu Full Field Development FAT
Siemens Nürnberg Frequency Converters Sohar Refinery Improvement FAT
Industronic Wertheim PAGA System Umm Lulu Full Field Development FAT
Sandvik Remshalden Sulphur & Water Filters Atyrau Deep Oil Conversion Final Inspection
Driescher Moosburg Outdoor disconnectors Hanhwa EPC Final and Packing Inspection
Schott Landshut Terminal Headers LNG Break Bulk Rotterdam Pressure Test & Final Insp.
Rheonik Odelzhausen Mass Flowmeters EPC North Rumaitha CO2 Injection Calibration & Hydrostatic Test
Siemens Erlangen Power Management System ADGAS LG7 Project Software FAT
KSB Pegnitz centrifugal pumps ERC Refinery Balancing, PMI, Pressure Test, FAT, Packing Inspection
Siemens Ruhstorf Motors Turkmengas FAT
R.Stahl Schaltgeräte Waldenburg HV Distribution Boards Upper Zakum 750 Island Surface Facilities FAT
Siemens Ruhstorf Motors Kaombo FAT
KSB Pegnitz centrifugal pumps Jazan Power Island Pressure Test, FAT
KSB Pegnitz centrifugal pumps Petrol Regeneration Fujairah Pressure Test, FAT
Renk Augsburg gearbox Tengizchevroil FGP/WPMP contact check, cleanliness check
Siemens Nürnberg Steam Turbine Tengiz II Pressure Test, Rotor Balancing
KSB Pegnitz centrifugal pumps Eni Angola Block 15/06 Expediting
Siemens Frankenthal Steam Turbine Nickel West Kalgoorlie Smelter Rotor Balancing
KSB Pegnitz centrifugal pumps Bamboo SS1Q PIM
Siemens Nürnberg converter panels Upgrading of Mesaeed Town FAT
Vishay Landshut Capacitors Freeport LNG Liquefaction FAT
Siemens Nürnberg Motors Turkmenistan Ehane Cracker FAT
Leistritz Nürnberg screw pumps Sinovensa 2 FAT & Final Inspection
Siemens Ruhstorf Motors, VfD’s KNPC CFP Expediting
Leistritz Nürnberg screw pumps INTEVEP Final Inspection
Emerson Wessling Transmitter ANWERUP EPC2 Final Inspection
Siemens Nürnberg Motors QGC Upstream Project (PH 2) FAT & Final Inspection
R.Stahl Waldenburg Local Control Stations & Umm Lulu Full Field Final Inspection
KSB Pegnitz centrifugal pumps Reggane North FAT
Netzsch Waldkraiburg spiral pumps TGPC Expediting
Emerson Wessling Transmitter KNPC Clean Fuels Project Final Inspection
Huber Berching Horizontal Screens Cadaval Neda, Rio Inxerto, La Malata Expediting
Ritz Kirchaich SIS bus-bars Yamal LNG FAT
Voith Turbo Crailsheim Voricon Williams USA Expediting  
Voith Turbo Crailsheim Voricon Dominion USA Expediting  
Voith Turbo Sonthofen Voricon Williams USA Expediting  
Voith Turbo Sonthofen Voricon Dominion USA Expediting